خلاصہ

OSP Works Supervision in excavation, cable and duct laying, cable blowing
o Supervision of Optical Fiber splicing and Testing Activity (2 and 16 core)
o Supervision of T-joint Activity (16-Core)
o Joint survey of site with client subcontractors for base line drawing and implementation
o Site survey for Red Line Drawing and As Built Drawing
o Site Inspection with JP Subcontractor for PAT (Preliminary Acceptance Test)
o Installing manholes, hand holes, marker post installation, restoration and related civil works
o Making Daily Plan and Progress Report on daily basis and update to all levels
o To prepare sites for final acceptance and complete site documentation
o Procurement of Engineering and Civil Material, Store Management
o To coordinate between design departments, analyzing soil structural reports for work packages for Contractors and to execute necessary changes as per site requirements
Power manager in Electrical
Start working as Team leader Optical Fiber Cable operation maintenance

پراجیکٹس

Punjab Safe City project Lahore (PPIC3)

تجربہ

کمپنی کا لوگو
OSP Engineer
Technology at work (Huawei)
جولائی ۲۰۱٦ - موجودہ | Lahore, Pakistan

Quality control of out site plant cable network.
preparation of OSP related documents.
Making route surveys with much economy and feasibility.
Material planning,monthly requiements,Dispatch instructions.
Dealing with contractors,sub contractors and other operators.
Working plan for the given drawings.

تعلیم

Government College University Faisalabad
بیچلرز, , Electrical Engineering‎
Telecommunications
CGPA 2.7/4
2016

پیشہ ورانہ مہارتیں

ابتدائی Nutrition Management:
متوسط out site plantation

زبانیں

متوسط انگریزی